COMMERCIAL OR RESIDENTIAL PROPERTIES
RQC follows a thorough, multi-phase checklist to ensure your newly constructed property is spotless, safe, and ready!
The standard post-construction cleaning process typically includes:
PHASE 1
Initial clean
- Removal of Construction Debris: All leftover materials, trash, and large debris are cleared from the site.
- Dusting and Wiping Surfaces: Every surface, including walls, ceilings, baseboards, doors, door frames, light switches, and window sills, is dusted and wiped to remove fine construction dust.
- Floor Cleaning: Hard floors are swept, vacuumed, and mopped.
- Carpets and rugs are vacuumed.
- Window and Glass Cleaning: Windows, mirrors, and other glass surfaces are cleaned inside and out, including frames and tracks. Stickers, adhesive, and paint splatters are removed.
- Kitchen Cleaning: Cabinets (inside and out), countertops, sinks, appliances, backsplashes, and fixtures are thoroughly cleaned and sanitized.
- Bathroom Cleaning: Toilets, sinks, showers, tubs, mirrors, tiles, grout, and fixtures are cleaned and disinfected.
- Air Vents and HVAC: Vents, grates, and ducts are cleaned to remove dust and construction particles, improving indoor air quality.
- Light Fixtures and Ceiling Fans: All fixtures are dusted and wiped, including those in hard-to-reach areas.
- Cabinets, Closets, and Shelving: All storage spaces are cleaned inside and out.
- Baseboards and Trim: Detailed cleaning to remove dust.
- Paint and Stain Removal: Any paint splatters or stains on floors, windows, or fixtures are carefully removed.
PHASE 2
RQC Inspection
(1-2 days after initial clean)
- Final Detailing: Polishing of hardware, cleaning of mirrors, and a final inspection to ensure no dust or debris remains.
- Recheck all areas: confirm properly cleaned and all dust and debris has been removed.
PHASE 3
Client inspection and approval
(5 days max after Phase 2)
- Final inspection: Inspect all areas per Phase 1 are cleaned to quality standards.
- Approval: provide approval of clean and invoicing
Some items are not standard in every post-construction cleaning but may be requested for an additional fee or due to unique project needs:
- Exterior Cleaning: Power washing driveways, patios, exterior walls, and cleaning exterior windows
- Deep Cleaning of HVAC Ductwork: Beyond vent covers, a more thorough cleaning of ducts.
- Detailed Cleaning of Specialty Surfaces: Such as natural stone, stainless steel, or custom finishes.
- Cleaning Behind/Under Appliances and Furniture: Especially if these were installed before cleaning.
- Sticker/Label Removal: From windows, appliances, or fixtures.
- Garage, Basement, or Attic Cleaning: If these areas were used during construction or affected by dust/debris.
- Hazardous Material Removal: If any hazardous substances were present or disturbed during construction.
- High-Access Areas: Cleaning skylights, high windows, or light fixtures requiring ladders or special equipment.
- Sanitizing and Fumigation: For added hygiene.
- Furniture and Upholstery Cleaning: If furniture was present during construction.
- Appliance Deep Cleaning: Inside ovens, refrigerators, dishwashers, etc.
- Carpets and rugs: steam cleaned
OUR GUARANTEE
- Tailoring the final walk through checklist to the specific needs of the property and our client
- Using documented checklists with photos or videos to ensure consistency and clarity for cleaning staff
- Regular check-ins to ensure top quality cleaning and support is being provided